What may happen to the material placed if problems such as poor bond are encountered?

Prepare for the QMS Roadway Test with comprehensive study tools. Use our flashcards and multiple choice questions to ensure you're ready for the exam!

If problems such as poor bond are encountered with the material placed, it may be subject to removal because a poor bond can significantly compromise the structural integrity and functionality of the construction. Ensuring adequate bond strength is critical in applications such as pavement, concrete overlays, or other bonded materials where adherence affects performance. If the material does not bond properly, it can lead to issues such as delamination, cracking, or failure under load, necessitating removal to maintain safety and quality standards. Addressing these issues promptly by removing the substandard material is essential to prevent further problems down the line and to ensure that the project meets all required specifications.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy